Description of the 20 Kg PM Finisher Paste:
PM Finisher paste of 20 Kg in cement powder specially designed for grouting HYDROPANEL facades.
Application temperature higher than 5 ºC. Mixing water: 0.46 l of water per 1 kg of powder (9.2 l/20 kg bag and 1.85 l/4 kg bag).
Pot life of the mixture: 30 min.
Working time or manageability: 30 min at 20ºC.
It can vary with temperature and humidity.
White color.
Drying time for sanding: 4 hours at 20ºC
Application time of the next step: 4 hours /mm.
Theoretical consumption: 0.38 kg/m2 (For Q2 finish).